Acid fumes 10 (c) & 24 (j) and (k)
Arc lamps, Construction of 49
Arc lamps, Installation of 19
Arc lamps, On low-potential circuits 29
Base frames, Generators and motors 1 (i), 8 (a)
Batteries, Storage or primary 10
Binding screws, not to bear strain 8 (f)
Bonds, rails and car houses 35 (g)
Boxing, where necessary 18 (e), 24 (f) 32 (d)
Breweries 24 (i) to (k)
Burglar alarms 57 (b)
Burrs and fins. Fixture work. 26 (b)
Bushings, For wires 14 (d)
Bushings, Lamp sockets 28 (e)
Bus bars 2 (b), 3 (e)
Cabinets for cut-outs 46
Care and attendance 6
Car houses 35
Carrying capacity table 16
Car wiring 34
Central stations 1 to 7
Circuit breakers, Construction of 44
Circuit breakers, Installation of 17, 21 (e)
Compensator coils 30
Concealed wiring 24 (a) to (f) & (r) to (t)
Condensers 53 (b)
Conductors (See Wires.)
Conduits, Installation of 25
Conduits, Insulated approved list page 45
Conduits, Insulated metal 41 (b) to (i)
Conduits, To be marked 41 (a)
Conduits, Uninsulated metal 41 (j) & (k)
Conduit work 24 (m) to (q)
Constant-current systems 18 to 20
Constant-potential systems, General Rules 21 to 23
Converters. (See Transformers.)
Cut-out cabinets
Cut-outs, Construction of 44
Cut-outs, Installation of 17 to 21
Cut-outs, Marine work 68
Cut-outs, To be double pole 17 (a)
Decorative series lamps 31
Distance between conductors, inside 18 (d), 24 (h), (j), & (s)
Distance between conductors, outside 12 (b)
Drip loops at service entrances 12 (g)
Dynamo rooms 1 to 7
Economy coils 30
Electric gas lighting 58
Electric heaters 23
Electro-magnetic devices for switches 20 (c)
Equalizers (See resistance boxes)
Extra high-potential systems 38 & 39
Feeders, Railway 35 (f)
Fished wires 24 (c) & (t)
Fittings and materials 40 to 55
Fixtures 26
Fixtures, Marine work 69
Fixture wire 40 (d)
Fixture wiring 24 (u) to (w)
Flexible cord, Construction of 40 (c)
Flexible cord, Construction of, Heaters 40 (c-3)
Flexible cord, Construction of, Pendants 40 (c-1)
Flexible cord, Construction of, Portables 40 (c-2)
Flexible cord, Use of 28
Flexible tubing page 45
Foreign currents, protection against 57
Formula for soldering fluid 59
Fuses, Construction of 25
Fuses, Installation of 21
Gas lighting, Electric 58
General plan of rules page 3
General suggestions page 4
Generators 1
Generators, Marine work 60
Grounded circuits 36
Grounding of dynamo and motor frames 1 (c-8) (a)
Grounds, Testing for 7
Ground wire for lightning arresters 5-c, 57 (b-5)
Hanger-boards, Construction of 48
Hanger-boards, When not used 19-d
Heaters, Electric 23
High, constant-potential systems 32 to 37
Incandescent lamps as resistances 29-b
Inside work 14 to 39
Insulating joints, Construction of 51
Insulating joints, When required 26-a
Insulation of trolley wires 12-k
Insulation resistance 56
Interior conduits. (See conduits)
Joints, in conductors 12-f, 14-c
Joints, in interior conduits 25-d
Joints, Insulating. (See Insulating Joints)
Lamps, Arc (See Arc Lamps)
Lamps, Incandescent series 20
Lightning arresters, Construction of 55
Lightning arresters, Installation of 5
Lights from trolley circuits 36
Low-potential systems 24 to 31
Marine work 60 to 72
Materials, Approved pages 44 & 45
Mechanical injury, Protection against 18-e, 24-e, 32-d
Motors 8
Motors, Marine work 72
Moulding, Construction of 42
Moulding, Marine work 71
Moulding work 24-a to f, l, & m
Oily waste 6-b
Open wiring 24-a to k
Outside work 12 & 13
Portable conductors 40 (c-2)
Portable conductors for marine work 62
Protective devices, signal circuits 57-b
Power from trolley circuits 36
Railway power plants 9
Reactive coils 53-a
Resistance boxes, Construction of 52
Resistance boxes, Installation of 4
Resistance boxes, Marine work 66
Resistances for arc lamps, Low-potential 29-b
Series lamps 31 & 37
Service blocks 12-b
Sockets, Construction of 47
Sockets, Installation of 27
Sockets, Marine work 70
Soldering fluid formula 59
Spark arresters, Construction of 50
Spark arresters, When required 19-c, 29-c
Storage battery rooms 10
Switchboards 8
Switchboards, Marine work 65
Switches, Construction of 43
Switches, Electro-magnetic 20-c
Switches, Installation of 17 & 22
Switches, Marine work 67
Switches, To be double pole 17-a
Switches, When may be single pole 8-c, 22-c
Systems, Constant-current 18 to 20
Systems, Constant-potential 21 to 39
Systems, Extra high, constant-potential 38 & 39
Systems, High, constant-potential 32 to 37
Systems, Low, constant-potential 21 to 31
Telegraph, telephone, and other signal circuits 57
Testing 7
Transformers in central stations 11
Transformers, Construction of 54
Transformers, Inside 33
Transformers, Outside 13
Tubing, Flexible page 45
Wire, Concentric 47-e
Wire, Fixtures 40-d
Wire, Insulated conduit 40-e, l
Wire, Insulation of 40
Wire, Netting required on arc lamps 19-c, 29-c
Wire, Rubber-covered 40-a
Wire, Uninsulated conduit 40 (e-2)
Wire, Weatherproof 40-b
Wires, Carrying capacity table 16
Wires, Carrying capacity table, Marine work 64
Wires, Central stations 2
Wires, Concealed work 24-r to t
Wires, Conduit work 24-n to q
Wires, Distance between, inside 18-d, 24-h, j & s
Wires, Distance between, outside 12-b
Wires, Extra high-potential 38 & 39
Wires, Fished 24-c & t
Wires, General rules, low-potential 24-a to f
Wires, Ground return 12-m
Wires, High-potential 32
Wires, Inside, constant-current 18
Wires, Inside, general rules 14
Wires, Underground 15
Wires, Marine work 61
Wires, Moulding work 24-l & m
Wires, Open work, damp places 24-i to k
Wires, Open work, dry places 24-g & h
Wires, Outside, overhead 12
Wires, Rubber covered, approved list page 44
Wires, Trolley 12-j to m